The Gekko team has met their deadline! In only six weeks since the agreement was signed with the
Victorian Government, the GeVentor project team has achieved its goal of developing a ventilator.

The team has achieved the following project outcomes:

  • Develop a prototype
  • Demonstrate its feasability
  • Complete product testing
  • Identitify pathway for regulatory approval
  • Develop a manufacturing strategy to be able to produce significant product volumes for a reasonable price within a short lead time if required.

What have we achieved during this 6- week period?

  • Identified and formed a highly skilled collaborative team
  • Developed a fit for purpose ventilator
  • Manufactured total of 10 prototypes which have extensively been tested
  • Developed a full Bill of Materials (BOM) with as much as possible locally supplied components
  • Extensive documentation
  • Developed plans for production if we receive permission and sufficient demand.

Download Python Brochure

 

The brochure contains details on the following:

- Python Environomics

- Potential Mine Cost Savings

- Successful Python Installation Steps

- State of the Art Design

Thank you for your interest in the Gekko Python

Download GeVentor Brochure

Information included is:

- Key design facts

- Operating principles

- Unit features and control

- Preliminary ventilator comparison

Thank you for your interest in the GeVentor